Nebraska Public Power District

Pretech built 4 - Stoplog structures that were 12' to 25' in height with the lightest piece being 26,000 lbs and the heaveyest being 98,000 lbs  (These stop log structures were used to regulate the water level of four different cooling ponds at the Power Plant)  The structures were built in two peices (that were assembled in the field) a base and the riser, after assemly there was concrete poured to hold them together.

Project Details

PROJECT SPOTLIGHT

HOME / PROJECT SPOTLIGHT

Job Name: Nebraska Public Power District

 

Location: Sheldon Station NPDES Lincoln Nebraska

 

Owner:

 

Equipment:

 

Start Date: July 2009

 

End Date: July 2009

 

Pretech PT #: PT #5214

 

Contractor: Kissick Construction

 

General:

 

Project Manager:  Dennis Richardson

 

Cover Sheet: Click to View

 

Shop Drawings: Click to View

Request a Material Quote

Submitting Form...

The server encountered an error.

Form received.

Bill Bundschuh

- President/Owner -

bill@pretechcorp.com

 913-927-1680

8934 Woodend Rd, Kansas City, KS 66111

(913) 441-4600

 

© Copyright 2016 Pretech Corporation. All Rights Reserved.

 

 

CONTACT US

CERTIFICATIONS

MEMBERSHIPS