Pretech built 4 – Stoplog structures that were 12′ to 25′ in height with the lightest piece being 26,000 lbs and the heaveyest being 98,000 lbs (These stop log structures were used to regulate the water level of four different cooling ponds at the Power Plant) The structures were built in two peices (that were assembled in the field) a base and the riser, after assemly there was concrete poured to hold them together.
BOX CULVERT / BRIDGE SPANS
Home / Projects / Box Culvert/Bridge Spans / Nebraska Public Power District
Project Details
Job Name:
Nebraska Public Power District
Location:
Sheldon Station NPDES Lincoln Nebraska
Owner:
Equipment:
Start Date:
July 2009
End Date:
July 2009
Pretech PT #:
5214
Contractor:
Kissick Construction
General:
Project Manager:
Dennis Richardson
Engineering Firm: