BOX CULVERT / BRIDGE SPANS

Home / Projects / Box Culvert/Bridge Spans / Nebraska Public Power District

Nebraska Public Power District

Pretech built 4 – Stoplog structures that were 12′ to 25′ in height with the lightest piece being 26,000 lbs and the heaveyest being 98,000 lbs  (These stop log structures were used to regulate the water level of four different cooling ponds at the Power Plant)  The structures were built in two peices (that were assembled in the field) a base and the riser, after assemly there was concrete poured to hold them together.

NE Public Power District – Detail Drawings

Project Details

Job Name:

Nebraska Public Power District

Location:

Sheldon Station NPDES Lincoln Nebraska

Owner:

Equipment:

Start Date:

July 2009

End Date:

July 2009

Pretech PT #:

5214

Contractor:

Kissick Construction

General:

Project Manager:

Dennis Richardson

Engineering Firm:

Bill Bundschuh

President/Owner

[email protected]

 913-927-1680