News 2
Some said it couldn’t be done, others asked why? We said, “Why not?” Just because something looks too big to precast doesn’t mean it is. Give our engineers a chance to look it over. By going with precast you can spend less time on the job and be sure the structure was made in factory
News 1
Some said it couldn’t be done, others asked why? We said, “Why not?” Just because something looks too big to precast doesn’t mean it is. Give our engineers a chance to look it over. By going with precast you can spend less time on the job and be sure the structure was made in factory
Check this out!
Some said it couldn’t be done, others asked why? We said, “Why not?” Just because something looks too big to precast doesn’t mean it is. Give our engineers a chance to look it over. By going with precast you can spend less time on the job and be sure the structure was made in factory
Kauffman Performing Arts Center
4 each 16.5′ x 12.5′ x 14.0 Transformer Vaults, 2 each 13.75′ x 6.5′ Switchgear Vaults and 1 each 15.5′ x 12.5′ x 14.0′ Transformer Vault Kauffman Performing Arts Center – Detail Drawings
Kauffman Performing Arts Center Read More »
Park University “East Wall”
Precast Retaining Wall Consist of: Auger Piling with precat panels attached with hidden clips and a wall cap. This wall is unique because it was on both a horizontal and verticle radius. Park University East Wall – Detail Drawings
Park University “East Wall” Read More »
Turkey Creek Cherokee Interceptor
This project is part of the KCK and Army Corp. effort to separate joint use sewers (Sanitary and Storm). The job consisted of 1024 feet of gasketed 78″ dia. Class III and V Reinforced Concrete Pipe (RCP), 428 feet of gasketed 72″ dia. Class III RCP, 392 feet of gasketed 66″ dia. Class III RCP,
Turkey Creek Cherokee Interceptor Read More »
Turkey Creek Basin S.W. Blvd & Rainbow
This project is part of the KCK and Army Corp. effort to separate joint use sewers (Sanitary and Storm). The job consisted of 800 feet of gasketed 96″ dia. Class V Reinforced Concrete Pipe (RCP)(200 feet was jacked under a railroad line), 950′ of 7’x7′ Reinforced Concrete Box Culvert (RCB), 300 feet of 6’x6′ RCB,
Turkey Creek Basin S.W. Blvd & Rainbow Read More »